蒙自Longtou Township, Yizhou District, Hechi City — 60T/H Integrated Water Purification Equipment

Longtou Township, located in the southwestern part of Guangxi within a karst landform mountainous area, has very limited water sources suitable for drinking water for urban and rural residents. It requires the convergence of multiple mountain spring streams to ensure an adequate water supply. However, managing these multiple water sources is challenging, as water sometimes needs to be delivered two or even three times to gather sufficient quantity. Additionally, since the water sources are collected from multiple mountain streams, they are highly susceptible to contamination, resulting in increased turbidity and elevated levels of microorganisms, posing potential safety hazards for drinking water.

Category:

Product Description

Longtou Township, located in the southwestern part of Guangxi within a karst landform mountainous area, has very limited water sources suitable for drinking water for urban and rural residents. It requires the convergence of multiple mountain spring streams to ensure an adequate water supply. However, managing these multiple water sources is challenging, as water sometimes needs to be delivered two or even three times to gather sufficient quantity. Additionally, since the water sources are collected from multiple mountain streams, they are highly susceptible to contamination, resulting in increased turbidity and elevated levels of microorganisms, posing potential safety hazards for drinking water.

Water Purification Equipment

 

河池市宜州区龙头乡—60T/H一体化净水设备

 

Currently, Longtou Township has a daily water demand of approximately 500 tons. To eliminate water quality safety hazards while meeting the water supply requirements, our company has adopted integrated water purification equipment combined with chlorine dioxide dosing equipment to treat the water source, with a treatment capacity of 60T/H (utilizing two 30T/H mechanical filtration tanks).

 

河池市宜州区龙头乡—60T/H一体化净水设备

河池市宜州区龙头乡—60T/H一体化净水设备

 

The equipment arrived at the installation site on November 16 and installation work commenced. The equipment was commissioned and installed by November 24. During the trial operation phase, the water output and various indicators fully complied with the requirements of GB2006.

 

河池市宜州区龙头乡—60T/H一体化净水设备

 

For more information on integrated water purification equipment, please contact us immediately at 18174741747.